BUILD
Building on water has huge opportunities, but it’s not without challenges. Organizing the right funding, licenses, public facilities, building logistics, safety and maintenance of the waterplot – usually with numerous stakeholders at the same time – are all part of it.
The good news is: building on water can be done! Based on our experience, it takes 4 steps.
4 Steps
1. DO A QUICK SCAN
Analyze the technical, political & social feasibility of floating developments on a specific location. So you can decide whether the location is suitable or not.
2. DEVELOP A CONCEPT
Do research on stakeholders, legislation, water ecology, quality and waves. Make a business plan and design your concept, including 3D-impressions.
3. BUILD A PILOT
We can help you with the detailed design drawings and the licenses and permits you need. Then: you can start building! It’s important to evaluate with partners and stakeholders, during and after the construction phase.
4. ENLARGE
Does your pilot work? Then improve and enlarge it.
Need Help Or Advice?
Feel free to contact us and find out how we can work together.
Latest Projects